Community Centre SIGNAGE

GH Dawe Community Centre

Behrends was awarded the exterior building signage through the tendering process. Behrends later worked directly with the City of Red Deer for the interior signage to the GH Dawe Community Centre Expansion.

  • Interior Lit Exterior Building Signage
  • Interior Wayfinding

Project overview

Working directly with CANA Construction, Behrends had to pre-determine the anchoring brackets for the signage due to the angles of the exterior faced finishing which provided immense detail to the overall architecture over the GH Dawe Community Centre.

Project details

Detailed drawings and 3D renderings were supplied both to The City of Red Deer and CANA Construction detailing anchor points, lighting components and requirements, and mounting details.

All this coordination well in-advance of manufacturing the signage created a seamless install which otherwise could have created a lot of problems if these potential issues were not foreseen.

Project results

It is always an honour to be apart of such an amazing project such as the GH Dawe Community Centre. Feel free to enjoy the photos and video.

The expansion of the community centre includes an NHL-sized hockey rink, enlargement of the existing rink, expanded fitness centre, an outdoor spray park, enhanced parking and improved facility access. The project was completed and opened to the public on March 19, 2023. 

Signage Features

Signage Solution

Tailored signage solutions that amplify your brand

The value-engineered A–to–Z custom signage solutions for your most ambitious signage needs.